By QIYU editorial team · Updated 26 October 2026 · Procurement information

Choose a system through a project review, rather than a product name alone. Begin with the hazard, enclosure and the approval pathway at the destination.

Compare the inputs that matter

System familyQuestions for the project review
Water mistWater supply, nozzle arrangement, hydraulic design and hazard-specific evidence
FM200 / HFC-227eaEnclosure, agent quantity, discharge arrangement and destination requirements
FK-5-1-12Selected equipment format, agent documentation and model-specific approvals

Ask for evidence for the proposed configuration

Review current product documentation and confirm the equipment scope. A company management-system certificate does not establish approval of a particular system design.

This guide supports procurement discussions. Final design and approval require qualified project professionals and the applicable local requirements.

Discuss your specification